Tag: LibrePlan
Work
No areas/subareas matching tagNews
JacoboAragunde
Fixing two bugs with one patch. Feelin' good. #libreplan #igalia at 17:09 Feb 16th 2012 by Jacobo Aragunde
diepg
blog post: Back from Fosdem http://t.co/BlNv9a6i #igalia #libreplan #fosdem at 16:56 Feb 8th 2012 by Diego Pino
Igalia goes to FOSDEM 2012
As has become tradition, Igalia will be present at FOSDEM, the biggest FLOSS developer event in Europe. 4 - 5 February, Brussels, Belgium.
teoromera
@cenatic interesante, pero falta #LibrePlan!! http://t.co/oDfgyM5g #igalia at 10:35 Jan 26th 2012 by Teo Romera
L’italiano arriva a LibrePlan
First of all, I’d like to announce that in a few days LibrePlan 1.2.1 will be released. This is a minor release including lots of bufixes done since 1.2.0. Thanks to all the users for reporting the different problems you have found in the tool, with...
Projects
LibrePlan
LibrePlan is a free software collaborative tool to plan, monitor and control projects and has a rich web interface which provides a desktop alike user experience and which comes with a comprehensive set of features.
Labs projects
No labs projects matching tagCommits
Remove scenarios option from configuration window
Remove scenarios option from configuration window
Manuel Rego22/02/2012i18n: Avoid to translate language names and use the original ones
i18n: Avoid to translate language names and use the original ones
Manuel Rego22/02/2012Bug #1355: START IN FIXED DATE constraints don't change to NOT EARLIER THAN
Bug #1355: START IN FIXED DATE constraints don't change to NOT EARLIER THAN
Jacobo Aragunde20/02/2012Bug #1281: Remove unneeded checkVersion when editing progresses
Bug #1281: Remove unneeded checkVersion when editing progresses
Manuel Rego20/02/2012Mark "Group by weeks" by default in MonteCarlo as it returns better results
Mark "Group by weeks" by default in MonteCarlo as it returns better results
Manuel Rego17/02/2012