Tag: LibrePlan

Work

No areas/subareas matching tag

News

JacoboAragunde

Fixing two bugs with one patch. Feelin' good. #libreplan #igalia at 17:09 Feb 16th 2012 by Jacobo Aragunde

diepg

blog post: Back from Fosdem http://t.co/BlNv9a6i #igalia #libreplan #fosdem at 16:56 Feb 8th 2012 by Diego Pino

Igalia 02/02/2012

Igalia goes to FOSDEM 2012

As has become tradition, Igalia will be present at FOSDEM, the biggest FLOSS developer event in Europe. 4 - 5 February, Brussels, Belgium.

teoromera

@cenatic interesante, pero falta #LibrePlan!! http://t.co/oDfgyM5g #igalia at 10:35 Jan 26th 2012 by Teo Romera

Manuel Rego 18/01/2012

L’italiano arriva a LibrePlan

First of all, I’d like to announce that in a few days LibrePlan 1.2.1 will be released. This is a minor release including lots of bufixes done since 1.2.0. Thanks to all the users for reporting the different problems you have found in the tool, with...

Projects

LibrePlan

LibrePlan is a free software collaborative tool to plan, monitor and control projects and has a rich web interface which provides a desktop alike user experience and which comes with a comprehensive set of features.

Labs projects

No labs projects matching tag

Commits

Remove scenarios option from configuration window

Remove scenarios option from configuration window

Manuel Rego22/02/2012

i18n: Avoid to translate language names and use the original ones

i18n: Avoid to translate language names and use the original ones

Manuel Rego22/02/2012

Bug #1355: START IN FIXED DATE constraints don't change to NOT EARLIER THAN

Bug #1355: START IN FIXED DATE constraints don't change to NOT EARLIER THAN

Jacobo Aragunde20/02/2012

Bug #1281: Remove unneeded checkVersion when editing progresses

Bug #1281: Remove unneeded checkVersion when editing progresses

Manuel Rego20/02/2012

Mark "Group by weeks" by default in MonteCarlo as it returns better results

Mark "Group by weeks" by default in MonteCarlo as it returns better results

Manuel Rego17/02/2012